IMECH-IR  > 环境力学重点实验室(2009-2011)
Safety Monitoring for Second Lining Structure of Beijing Subway Line 15 First Phase' Three Segments
Hou YF(侯岳峰); Meng D(孟达)
会议录名称CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT
2010
会议名称International Conference on Civil Engineering
会议日期JUL 19-20, 2010
会议地点Baoding, PEOPLES R CHINA
摘要Ma Quan Ying Station (Xiangjiang Bei Lu Station) similar to Cui Ge Zhuang Station on Beijing Subway Line 15 set air passage for tunnel boring machine. Tunnel boring machine on right line has through air passage safety, and cannular shield have not been removed. Tunnel boring machine on left line from the air passage are 255 circuits (306 m), for the speed of tunnel boring machine is 20 similar to 30 circuits pre day, start monitoring the effect on the second lining structure during tunnel boring machine digging process. Use of advanced fiber Bragg grating sensor, and with a Si425 Bragg Grating Demodulator as a data collector, by corresponding formulas calculate the micro-strain of points on wall, to study the second lining structure status when under press during tunnel boring process. In the final 100 meters, on the 32 monitoring sites for monitoring the stress and strain. For the other tunnels provide a basis for inference.
语种英语
文献类型会议论文
条目标识符http://dspace.imech.ac.cn/handle/311007/45659
专题环境力学重点实验室(2009-2011)
推荐引用方式
GB/T 7714
Hou YF,Meng D. Safety Monitoring for Second Lining Structure of Beijing Subway Line 15 First Phase' Three Segments[C]CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT,2010.
条目包含的文件 下载所有文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
ID-59.pdf(1154KB)会议论文 开放获取CC BY-ND浏览 下载
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
Lanfanshu学术
Lanfanshu学术中相似的文章
[Hou YF(侯岳峰)]的文章
[Meng D(孟达)]的文章
百度学术
百度学术中相似的文章
[Hou YF(侯岳峰)]的文章
[Meng D(孟达)]的文章
必应学术
必应学术中相似的文章
[Hou YF(侯岳峰)]的文章
[Meng D(孟达)]的文章
相关权益政策
暂无数据
收藏/分享
文件名: ID-59.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。